Back

E-Z On Wood Floor Sealer

Oil-modified wood floor sanding sealer used as the first coat application after wood floors have been newly sanded. VOC 349 grams/liter

  • Ecolab PIC: 6114509
  • GTIN Number: 00025469145093
Features & Benefits

Features & Benefits:

Seals wood floors and promotes adhesion for better performance with wood floor finishes Under normal usage E-Z ON will not powder, flake or peel off.

Uses/Solutions:

Use as first coat application after wood floors have been newly sanded. May be restrictions on this product in some areas due to VOC regulations.

Effective Against/On:

Use on newly sanded wood floors. Can be used as first coat for both oil modified and water dispersed wood floor finishes

How To Use

Directions for Use:

  1. Before tacking, be sure doors are locked and air movement (fan) is turned off.
  2. Sweep and vacuum all dust from floor. Do not use treated dust mops. Floor dust is combustible. Remove it from vacuums and all containers.
  3. Tack floor with Seal-O-Solv dampened turkish towels, tightly wrung out. Repeat tacking until floor is dust-free.
  4. Allow floor to dry until there is no sign of moisture.
  5. Apply E-Z ON using one of the applications listed below.* Work steadily without stopping, feathering as you go until the entire coat is applied.
  6. Allow E-Z ON to dry 24 hours (longer if humidity is > 70%). Screen entire floor with 100 grit screen until E-Z ON is uniformly dull.
  7. Repeat steps #1-6 for second coat.
  8. Tape lines and keys for painting. Paint floor as needed and allow paint to dry according to paint manufacturer's recommendations.
  9. Dry screen painted area with a 150 grit screen to remove all paint luster to a uniform dullness. This must be done to avoid peeling of the seal from the paint.
  10. Repeat steps #1-6 for third coat.
  11. Repeat steps #1-5 for fourth coat.

Recoating Procedure for Previously Coated Floors:

  1. Remove all soil. Wear non-marking soft-soled "gym" shoes. Check for wax, gum, or other substances.
  2. Screen entire floor with 100 grit screen until floor is uniformly dull. Remove any swirl marks with 150 grit screen.
  3. Before tacking, be sure doors are locked and air movement (fan) is turned off.
  4. Sweep and dry vacuum all dust from floor. Do not use treated dust mops. Floor dust is combustible. Remove it from vacuums and all containers.
  5. Tack floor with Seal-O-Solv dampened turkish towels, tightly wrung out. Repeat tacking until floor is dust-free.
  6. Allow floor to dry until there is no sign of moisture.
  7. Apply E-Z ON using one of the applicators listed below.* Work steadily without stopping, feathering as you go until the entire coat is applied.
  8. If more than one coat is desired, allow to dry 24 hours (longer if humidity is > 70%). Repeat steps #1-7.

Additional Notes:

  • Apply E-Z ON using the E-Z Way applicator, light weight T-bar, or conventional pan block method at the rate of 350-600 square feet per US gallon.
  • Maximum hardness is not reached for several days. The following guidelines may be used. Light traffic in (3) days, heavy traffic in (7) days.
  • Avoid applying on extremely hot and humid days or when floor temperature is below 70°F.
  • Do not use detergents or other cleaners for 14 days.
  • Do not cover floor with anything that will retard the curing process.
  • Let floor cure for 30 days with good drying conditions before covering.
Top
alert-icon

This site uses cookies and other technologies to offer you a better browsing experience, analyze site traffic, and provide you with personalized content. By using this site, you consent to our use of cookies. Read our Privacy Policy as well as our Cookie Policy for more information.